How we work
How Your Project Moves Forward
Tell us about your project. We review the work, prepare a written estimate and agree on the next steps with you before scheduling.

From your first request to the final walkthrough
Five stages, with a clear decision at each one. Open a stage to see the details.
Phase 01Before we quoteLivanzh LLC confirms fit, service area and the conditions an estimate must reflect.
Request and initial qualification
The work and address are checked for fit.
We review the work, address and relevant conditions. If another trade is a better fit, we say so early.
Site assessment
We assess visible site conditions before preparing the estimate.
A site assessment is normally required because conditions behind existing finishes cannot be priced from a description. If a visit is not needed, Livanzh LLC says so. The current visit fee and timing policy is published before anything is scheduled.
Read the site visit policy
Phase 02Agreeing the scopeThe scope, exclusions, materials responsibility, price and acceptance are recorded before work starts.
Scope and estimate preparation
Inclusions, exclusions and dependencies are written down.
Livanzh LLC writes what is included, what is excluded and what depends on conditions found after work starts. The estimate connects the price to that scope.
Electronic acceptance
Your electronic acceptance records the estimate version and date.
The customer confirms the estimate electronically. That confirmation records what was agreed and provides the reference for closeout.
Contract, payment and material terms
Payment and materials responsibility are agreed for the project.
Payment terms are set per project. We do not force every job onto one schedule. The same written record says who supplies each material.
Phase 03Getting readyDates, access and the appropriately licensed specialists are confirmed before the workday.
Scheduling
Dates reflect access, occupancy and specialist availability.
Scheduling follows scope acceptance. Occupancy, tenant notice, access, commercial operating hours and specialist availability all affect a workable date.
Licensed-trade coordination
Plumbing, electrical, gas and HVAC portions can be included in one coordinated project.
When a project includes work that requires a licensed trade, the appropriate specialist is engaged for that part of the scope.
Phase 04During the workLivanzh LLC follows the agreed scope and prices any necessary change before proceeding.
Work execution
The agreed scope remains the reference for work on site.
Livanzh LLC uses the approved scope to guide the work and the project record.
Concealed conditions and written changes
A change is priced and approved before the changed work begins.
A concealed condition becomes a change with its own scope and its own price. You approve it before that work happens. It does not turn up as an unexplained charge afterwards.
Inspections and permits
Permit and inspection requirements are established for the project.
Requirements depend on the scope and the municipality. Livanzh LLC works them out for your specific project instead of making a blanket claim.
Phase 05FinishingThe completed work is checked against the scope and project-specific closeout terms.
Final payment and closeout
The finished work is walked through against the agreed scope.
The written scope provides the closeout checklist and the record for final payment.
Warranty terms
Workmanship warranty terms are specific to the project agreement.
Workmanship warranty terms are documented for the applicable project scope in the estimate or agreement.
Start with what you know
Tell us which room or repair you have in mind, the project ZIP code and any timing you are working toward. A short description is enough to begin; photos are optional.